Team Building for Large Groups: How to Run 100 to 2,000 People in One Room
Team building for large groups works when everyone has a job and the whole room shares one outcome. A charity build does both. The Charity Bike Build and the Great Philanthropic Challenge run for up to 2,000 people at once, in a conference hall or hotel ballroom, in teams of about ten at their own stations, with donations direct to the chosen charity.

A team building event for 500 people works when all 500 have something to do. That is how we have run charity activities since 2011, from eight people in a meeting room to whole conferences, and more than 60,000 people have taken part.
The large events are the ones that get photographed most, because 200 bikes lined up at the front of a hall is a sight, and our formats are built for that scale. If you are building an agenda right now, our event planning page is the short version.
What makes a team building event work for a large group?
Every person has a practical role. Teams of about ten each build their own bike or care package at their own station, so the whole room is working at once. What they build is donated direct to the chosen charity.
Which team building events run for up to 2,000 people?
The Charity Bike Build has teams win their parts in a series of challenges, then build a bike from what they have won. Our mechanics safety check every bike, and each one goes to someone leaving a hostel, a young carer or a family with no car, with helmets, locks, lights and pumps. More than 3,000 have been built and donated since 2011. It runs for 8 to 2,000 people, indoors or out, in about two and a half hours. See the Charity Bike Build.
The Great Philanthropic Challenge sets six Crystal Maze style challenges, some physical and some mental, and every win adds an item to a care package. The receiving charity writes the list, so every pack holds what the charity has asked for. So far 631 have been delivered. It also runs for 8 to 2,000 people, indoors or out. See the Great Philanthropic Challenge.
Both work in a conference hall, and both have a handover that scales. Two hundred people means 25 bikes, or 25 care packages, at the front of the room.
Which events suit 100 to 500 people?
A mid sized group can choose from more of the range.
Scooter Dash takes fifty minutes and runs for up to 500 people. It fits a one hour slot in an agenda, and the scooters are donated direct to the chosen charity.
OnBoard has each team work on two skateboard decks, for up to 500 people. It is calm and creative, and the boards go to children and young carers living in poverty.
The Performance Wheelchair Challenge has teams build sports wheelchairs, then compete in them. It runs for up to 300 people, and the donation is the strongest in the range for a report.
Charity Building Challenges is a one hour format for up to 1,000 people, built for conferences and away days.
Browse all the events with group sizes on each.
How is a room of 500 people organised?
Teams of about ten each have their own station. Where we can, we mix departments and levels, so people learn from colleagues they would not normally work with.
Our crew runs the room from the front with a microphone and works the floor during the build, so a team that hits a snag gets help quickly. The challenges keep the pace, because teams earn their parts, and the whole room stays focused. Safety checks happen at each station as bikes are finished, and any bike that needs work is fixed until it passes.
The donation gives the build a purpose. With a big group that can mean dozens of bikes made for donation direct to the chosen charity. Ask us what photographs and donation records are available for your event.
How does a build fit into a conference agenda?
A conference agenda usually has a slot for the session that gets people out of their chairs, after the keynote and the breakouts.
Scooter Dash fits a one hour slot. It takes fifty minutes on the clock, alongside your AV, and delegates return to their seats for the next session with a scooter built. The Bike Build carries a whole afternoon: two and a half hours, then the handover, then drinks.
Both work alongside your venue and AV team. We deal with the venue directly on access and floor protection, and we work with your production team on timings and the microphone. Our event planning page covers how that runs.
How much does team building for a large group cost?
The price is a total for the group, set by size band, and it is the same anywhere in the UK. It includes the crew, the kit and the equipment that goes to the charity.
As a guide, the Charity Bike Build is £6,190 excluding VAT for up to 50 people, seven bikes donated, and £17,819 for up to 200 people, twenty five bikes. The Great Philanthropic Challenge is £3,271 for up to 40 people and £11,848 for up to 200, twenty five care packages. The Performance Wheelchair Challenge is £13,136 for up to 100 people, ten chairs. Above 200 people we work out a quote by hand.
Our guide to what charity team building costs has every band. Give the price tool a headcount and a rough location and it answers in about a minute.
What does an organiser need to have ready?
A room, a date and a rough headcount. That is the whole list.
Floor space is the one to check, because with a big group it matters most. Tell us the hall or ballroom size and we will confirm the fit, or say what would need to change.
We take care of the rest. We arrive before your delegates, set up every station, run the session and manage the charity handover. Afterwards you receive photographs, the donation figures and copy for the write up, so you have a clear answer when someone asks what the day achieved. If it needs to go in a report, our CSR team building guide lists the four figures to capture.
How to book team building for a large group
- Count the delegates. A rough headcount decides the size band and how many bikes or packages get built.
- Measure the hall. Floor space is the one thing that can change the plan, so tell us the size.
- Pick the slot. One hour for Scooter Dash, an afternoon for the Bike Build.
- Get the price. Use the price tool and you will have three events with figures in about a minute. Over 200, we quote by hand.
- Tell the venue and your AV team the date. We sort the practical details with them ourselves.
For the day in full, read how it works.
Every person in the room has a job
A charity build gives all 500 people a job and keeps the room moving, because teams earn their parts and the donations go direct to the chosen charity. It runs in the hall you already have and fits the slot you have, at the same price anywhere in the UK. The only thing to check is the floor space.
Questions we get asked
What is the largest group you can run a team building event for?
2,000 people at once, for the Charity Bike Build and the Great Philanthropic Challenge. Several other events run for up to 500.
How do you keep 500 people involved at the same time?
Teams of about ten, each building their own bike or care package at their own station. Everyone has a job, and what the team builds is donated direct to the chosen charity.
How long does a large group event take?
Scooter Dash takes fifty minutes. The Bike Build and the Great Philanthropic Challenge take around two to two and a half hours.
Do we need a special venue for a large group?
A conference hall or a hotel ballroom is usually enough. We deal with the venue directly on access and floor protection. Floor space is the one thing to check.
What happens to what we build?
Donations go direct to the chosen charity. We will confirm the donation arrangements for your event. Every bike is safety checked by our mechanics before it goes.
Can it work alongside our conference AV and production team?
Yes. Our crew runs the room from the front with a microphone and works with your production team on timings. Scooter Dash fits a one hour slot between sessions.
Events mentioned in this piece
Charity Bike Build

VINCI
Took our logistical pain away.
All attendees who gave us feedback have thoroughly enjoyed the activities and having been involved in other previous team building activities in the past they were really pleased that the activity had a meaningful purpose. From an organiser’s point of view, the team were very accommodating and took our logistical pain away by liaising directly with the venue so that we could concentrate on the rest of the event.
Bruno, Charity Bike Build
The Great Philanthropic Challenge

VINCI
Took our logistical pain away.
All attendees who gave us feedback have thoroughly enjoyed the activities and having been involved in other previous team building activities in the past they were really pleased that the activity had a meaningful purpose. From an organiser’s point of view, the team were very accommodating and took our logistical pain away by liaising directly with the venue so that we could concentrate on the rest of the event.
Bruno, Charity Bike Build
Performance Wheelchair Challenge

Kyriba
By far the best team building activity I have ever seen.
Having surveyed the team, this was one of the highest ranked sections of our 2.5 day conference. The session from o3e was exceptional, great team building activity and an amazing cause. Very proud of Kyriba, the leaders and organisers for having brought o3e to this event.
Gill, Performance Wheelchair Challenge
Scooter Dash

Kyriba
By far the best team building activity I have ever seen.
Having surveyed the team, this was one of the highest ranked sections of our 2.5 day conference. The session from o3e was exceptional, great team building activity and an amazing cause. Very proud of Kyriba, the leaders and organisers for having brought o3e to this event.
Gill, Performance Wheelchair Challenge